Thank you for reporting this issue! Public Works Engineering is aware of the problems on Tennessee Street. A portion of Tennessee Street is currently in design to have the street repaved. The design is currently in the early stages and the area of work has not been finalized. The City of Vallejo will take the striping needs in consideration when deciding the limits of work but we are limited by funding. Design is expected to be completed by end of 2020.
I have forwarded your comment to our traffic engineer stating there is a hazard in front of the school. The traffic engineer will perform a site visit. I will update this forum once I find out more information. Thank You.
11 تعليقs
Coco (مستخدم مسجل)
An anonymous SeeClickFix user (مستخدم مسجل)
تم إقراره Mey, Public Works (تم التحقق رسميا)
Mey, Public Works (تم التحقق رسميا)
Brant, Engineering (تم التحقق رسميا)
An anonymous SeeClickFix user (مستخدم مسجل)
Brant, Engineering (تم التحقق رسميا)
Public Works Maintenance Worker I (تم التحقق رسميا)
Public Works Maintenance Worker I (تم التحقق رسميا)
Public Works Maintenance Worker I (تم التحقق رسميا)
Public Works Maintenance Worker I (تم التحقق رسميا)